The People’s Committee of Quang Binh province approved the detailed construction planning of the Cam Lien Industrial Zone at a scale of 1/2000 through Decision 3295/QD-UBND dated December 28, 2012.
The total investment capital for the project is 1,840 billion VND, of which the investor’s contribution is 300 billion VND. The project implementation is scheduled from 2021 to 2028, with a duration of 50 years from the date of investment approval.
Industry attracting investment
| 租金 | 土地租金 $30/平方米 |
|---|
Internal transportation
Electrical system
The industrial zone is supplied with electricity from a 110/35/22KV transformer station: 2X40MAVlocated in the'industrial zone.
Public lighting system
The street lighting network is designed separately with a power supply system arranged along the transportation axes.
Water system
The water supply system within the industrial zone is designed in a loop configuration to ensure a stable and continuous water supply for the factories.
Wastewater and stormwater drainage system
The industrial zone plans a separate stormwater drainage system. They collect and direct rainwater to a central wastewater treatment area for processing.
Waste management
The industrial zone will collect and transfer solid waste to a transfer station.
At the transfer station, they will source-separate and transport the sold waste to the treatment facility.
Wastewater treatment
A separate drainage system collects industrial wastewater. Factories collect and direct their wastewater to a centralized
treatment facility. The wastewater undergoes treatment to meet discharge standards before being released outside.
Communication system
The interconnected system of the communication information center in the industrial zone ensures all communication needs and has the capability to provide necessary services such as a dedicated switchboard, international telephone, remote conferencing, dedicated channels, high-speed internet, email, etc.